Guia de instalação e limpeza sanitária IR100

Categoria:Instalação e limpeza

Tri-clamp, fluxo, drenagem, CIP/SIP e espaço de manutenção.

Installation position

Choose a well-mixed, representative location where the measuring surface remains covered. Avoid the highest point where bubbles collect and the lowest point where deposits accumulate.

Hygienic connection

Match the tri-clamp, seal and weld socket to the pipe size and cleaning procedure. The installed connection must be drainable and free of hard-to-clean dead legs.

Cleaning and verification

Record readings before and after cleaning, cleaning medium, temperature and duration. Confirm CIP/SIP limits against the model and project documentation.